OAK AVENUE STREETSCAPE
       This is a CRA funded project which will add continuity to
       the other phases of downtown streetscape projects. Oak
       Avenue demolished between 1st and 2nd. All pavers have
       been palletized.

       ST JOHNS PKWY INTERSECTION IMPROVEMENTS
       CPH, Inc. has designed an improvement to the intersection
       of St. Johns Parkway and Upsala Road.

       TERWILLEGER TRAIL
       The GAI Consultants designed trail will connect Seminole
       Boulevard to State Road 46. Condor Construction awarded
       bid. Clearing and grubbing has begun.
       CLOUD BRANCH DRAINAGE PHASE III
       Installed pipe under the rail road tracks using jack and bore
       on Elm Avenue.

       STORMWATER DIVISION
       Crew doing a pipe crossing in hazel glean to alieve standing
       water on a driveway that was gone in a few days. Crew
       digging out the ditch along Aero Lane we had to dig this out
       due to lack of best management practices by the contractor.
       Crew mowing ditches and pipe cleaning areas that are
       holding water.

       HIDDEN LAKE DRIVE AND LIVE OAK BOULEVARD
       SIDEWALK PROJECT
       Neel-Schaffer has designed a continuous sidewalk in the
       Hidden Lake subdivision in Fiscal Year 2017 over 10 lane
       miles of roadway were resurfaced city-wide.  Agendas were
       approved by the  City Commission for road and concrete
       services totaling over $1.5 Million in the 2018 budget year.

       STREET DIVISION


        Fallen tree blocking the
        road, tree removed and
        road reopened.



        Broken curb along Riverwalk, streets crew   Sign Shop installing a
        made the repair and it is as good as new.  new project sign.