Page 24 - CoS_AnnualReport_2018 FINAL
P. 24
Public Works & Utilities Department
Public Works & Utilities Department
Bilal Iftikhar, Public Works & Utilities Director
The goal of the Public Works Department is to build and maintain a community of the highest quality for our citizens by
keeping our lakes clean, drainage ways open, maintaining/improving the condition of our streets, maintaining/operating all city
controlled traffic signs, making sure pavement markings are safe and effective, and by providing a safe and reliable public water
and sewer system. We provide our residents with the best quality, responsive, and dependable service on a daily basis.
RIDGEWOOD AVENUE FROM SR 46 TO SEMINOLE
HIGH SCHOOL HAS BEEN RESURFACED ALONG
WITH TERRACE DRIVE FROM GEORGIA AVENUE
TO RIDGEWOOD AVENUE.
The entire Academy Manor subdivision was resurfaced.
10th and 11th Street from Mellonville Avenue to Sanford
Avenue was resurfaced. All of the above projects received a
1.5” mill and overlay.
STORMWATER LOCATES AND DRIVEWAY
INSPECTIONS – CITY WIDE
116 locates and 8 driveway inspections with 20 CO’s were
performed in the month of June. The inspector must meet
with the excavator many times to ensure our storm water
infrastructure is not damaged. Damage to our storm system
could create a potential flooding risk if compromised.
Inspectors must also meet homeowners to inspect
driveways and sidewalks being constructed on city
maintained right of ways to insure our infrastructure is not
compromised or affects neighboring property owners.
RIVERWALK PHASE III SEAWALL PROJECT
This is the seawall installation phase of the extension of the
Riverwalk from Mangoustine Avenue to the Central Florida
Zoo. The 12,000 feet of new seawall will raise the elevation
of the northern right of way along Seminole Boulevard
to allow construction of the final phase of the Riverwalk.
Riverwalk Phase III trail construction will begin sometime
next year and will include an extansion of the trail, new
lights, roadway improvements, landscaping, hardscaping
and an educational element.
17-92 BEAUTIFICATION PROJECT
Project will consist of new lighting, hardscape and sidewalk
improvements. Seminole County Commission approved
Inter-local Agreement at a reduced amount of $1,960,000.
Project has been rebid and opened January 18th 2018.
Gomez Construction awarded contract of $3,100,000.
Notice to Proceed May 7th. Conduit being directional
drilled for fiber and new roadway lighting.