Page 30 - CoS_AnnualReport_2018 FINAL
P. 30
Public Works & Utilities Department
Continued
CR 46 Water Main Relocation Training
Project Completed. • Inspector Brandon Ellenburg received his State of Florida
US 17-92 Relocation Project Water Distribution III License and his Waste Water Collection
continues on into 2018-2019 C License.
Pictured above the contractor • Inspector Brandon Arrington received his State of Florida
Water Distribution II License and his Waste Water Collection
has installed a Piling Wall near C License.
Lake Minnie. This construction • All inspectors renewed their Back Flow inspection testing
will create an impervious wall licenses.
between the road, storm ditch • Brandon Ellenburg and Scott Richardson graduated from the
and storm piping that will feed Effective Supervisory Practices training course.
into the lake. These pilings are • Scott Richardson received his Advanced Maintenance of
forty feet in length. Traffic Certification.
• Cross Connection Program
SR 46 Utility Relocation • Inspectors team and the Geographic Information System
Project (Melonville to SR 415) team have been working hard together to integrate the
The last connection was Cross Connection Control program into the Geographic
made near State Road 415 on Information System database. This will streamline the
State Road 46 in front of the information gathering and bring the Cross Connection
RaceTrac in May of 2018. Control program up to date logistically with Florida
This relocation project removed Department of Evironmental Protection requirements.
over 2 miles of old Asbestos Water and Sewer
Cement pipe, updated our
reclaim main line, re-routed our Repaired 68 sewer lines.
force main line and updated our Responded to over 11,500 locate tickets.
connection with the Midway Cleaned 3,000 linear feet of force mains.
Community among other Changed out 3,000 Automated Meter Reading Registers.
improvements. Department of
Transporation continues the Cleaned 515,000 linear feet of sewer lines.
road project. Completed 32 sewer and water disconnects for demolition.
East Lake Mary reclaim Main Rebuilt 105 vacuum pits and 8 buffer tanks.
Extension Phase II Rebuilt 175 vacuum controllers.
2800 feet of 12” reclaim main Replaced 6 fire hydrants.
is being pulled through the Installed 4 new water system valves.
ground on East Lake Mary near Repaired 250 service line leak or leaks at the meter.
Red Cleveland Boulevard. This
will extent the reclaim line from Repaired 6 main line breaks.
South Brisson Avenue to Ohio Replaced 10 commercial meter 3” or greater.
Avenue.
29