Follow-Up Audit of Sarasota County Area Transit (SCAT) Bus Operations Cash Handling, December 2017
7 | A u d i t o f S C A T B u s O p e r a t i o n s C a s h H a n d l i n g N o v e m b e r 2 0 1 6 2. Authorized vault access Observation To support the departmental dual‐control requirement for cash‐handling activities, the system is set up to necessitate two authorized employees to swipe their identification cards in order to gain access to the vault. The auditor was provided with a system report listing persons with authorized identification card access as of July 29, 2016. Two temporary employees, who were terminated March 24, 2016 and February 2, 2016, were included on the July 29, 2016 system report. This was brought to the attention of the SCAT Fiscal Manager, who immediately took action to have access removed. When the automated card system is inoperable, a manual key system is in place. Management advised that although it takes only one person to access the vault with a key, no log is maintained of who was present and why it was necessary to access with a key. Recommendation To ensure the safeguarding of County assets, procedures should be developed and implemented for removal of card access to the vault immediately upon termination of the employee or when the employee no longer needs access to perform their job. A manual log of when the vault is opened a key should be maintained and include signatures of the two persons present, date and time, and the reason for key access. Management Response The County’s employment agency is responsible for collecting badges when temporary assignments end, going forward they will also be responsible for informing Human Resources to turn off badge access. Additionally, the Fiscal Manager will email General Services to turn off vault access and remove name from list. An Excel spreadsheet has been created containing the following information: Employee Name Date and Time accessing vault Reason for accessing vault Signatures of personnel accessing vault (dual signatures required) This manual log (spreadsheet) will be maintained and stored in the Maintenance Manager’s office to be completed immediately after using key to access the vault. Expected date of implementation is November 30, 2016.
Made with FlippingBook
RkJQdWJsaXNoZXIy MzM3Mjg=